Design, Supervision & Monitoring Consultancy Services for Clean Air and Sustainable Environment Project (CASE Project: Contract Package No. DCC-AF-S2, funded by WB)

The demonstration projects to provide safer and cleaner mobility for those who walk and use public transport has been accepted positively in the CASE Project. Services includes - Construction of about 18.15 Kms of Sidewalks with surface drainage and ancillary road improvements; Improvement of signal infrastructure renovation of old cable connection, removal of old aspect, pole and foundations-things not included in the G1 & G2 Contract and maintenance & operational Services; Construction of Warehouse/Storehouse in DSCC area for traffic management in City; Road marking, Zebra crossing, Road sign and lane separator etc. in 92 Intersections; Maintenance of civil works (Side Walk, Drainage & others) through term contract; Physical works for improvement of disabled people’s mobility; Installation of Guard rail at Road Median, Footpath & Intersections –DSCC/DNCC area; Civil works with accessories maintenance, beautification, lighting, guard railing etc. (FOBs under CASE project); Operation of Signal Remote control system in traffic signals by the supplier of G1 & G2 as proprietary item including all the services and Piloting of Remote control (Envoys Electronics/ CMS Traffic); Installation of Metal box for traffic signal batteries; Any other task assigned by the Project Director.

location

Dhaka City

sector

Road and Infrastructural development

(880-2) 9102030, +8801714410853

write to us

deshupodeshltd@yahoo.com

contact us

Get in touch with us